IPA (Industrial Park Atyrau)
Provision of engineering infrastructure and services for the manufacturing of components and parts for oil and gas equipment.
What is IPA?
In 2023, Edil-Oral.kz LLP began the implementation of a project for localising the production of equipment, which will bring together original international manufacturers and service companies with a strong business synergy in one location. This will create conditions for the efficient use of shared resources to reduce costs and CO2 emissions while simultaneously increasing the share of local content in the production of equipment and spare parts following international standards.
The company has become the preferred supplier to major oil and gas companies in Kazakhstan, expanding its capabilities in mechanical engineering.
Based on established relationships over the past 10 years and experience working with global manufacturers, Edil-Oral.kz aims to become a centre of excellence in local production and services, responding to the evolving needs of the Kazakh market.
Territory
The location of IPA allows for efficient service to clients, taking into account the needs, logistics of personnel, local resources, and environmental impact.
Located outside of Atyrau on the Dossor highway, with convenient access to the road network.
Spacious premises with the potential for expansion.
No residential areas nearby.
There is water, gas, electricity, and a high-voltage line (10 kV - 3 MW).
Watch the PresentationStages/Achievements
November 2022:
A technical manager was hired to oversee the implementation and execution of the project.
December 2022:
A contract was signed with "Versio-Soft" for the design and planning of the building and infrastructure of the PND.
KPMG was engaged as a consultant to conduct research for establishing the "Edil-Oral" duty-free zone.
January 2023:
An order was placed for the supply of Dummy equipment.
February 2023:
A visit by the senior management delegation from NCOC and TCO to the "Edil-Oral" site.
The tender process for selecting a developer began.
December 2023:
Procurement of main equipment and its capabilities.
Completion of the first phase.
2024:
The start of the second phase.
Partners
Pumps
Inspection
Maintenance, repair, and overhauling
Production of components and spare parts
Modification and modernisation
Hydraulics
Testing and trials
Maintenance, repair, and overhauling
Production of seals and gaskets
Production of components and spare parts
Modification and modernisation
Motors
Rotor balancing up to 10 tons.
No-load testing of high and low-voltage electric motors
Rewinding of stators and phase rotors
Inspection, assessment, and failure analysis
Maintenance, repair, and overhauling
Production of components and spare parts
Thank You for Contacting Us
We will contact you shortly.
You Have Successfully Registered for the Course:
Detailed information has been sent to your email. azamata@gmail.com
Спасибо за обращение
Мы свяжемся с вами в скором времени